Uttarkashi Tunnel Crash: IG Garhwal Range says, "Stipulated (rescue) time can't be decided"
"The attempt at rescue is in progress and rescue is expected to be carried out very soon. It is machinery work so a stipulated time can't be decided...." Must read further on Dynamite News:
Uttarkashi: Inspector-General (IG) of Police Garhwal Range KS Nagnyal, speaking about the ongoing rescue operation of trapped 41 workers at Sikyara tunnel, said on Thursday that the stipulated time of the rescue cannot be decided as it is a machinery work.
"The attempt at rescue is in progress and rescue is expected to be carried out very soon. It is machinery work so a stipulated time can't be decided. The rescue work will go on at night as well," said IG.
Also Read |
Uttarkashi: Location for vertical drilling identified to evacuate 41 trapped labourers
Meanwhile, Uttarakhand Secretary and Nodal Officer for the Silkayara rescue operation Neeraj Khairwal, said on Thursday that Chief Minister Pushkar Singh Dhami and Union Minister General VK Singh (Retd) had a conversation with the trapped workers have told that they are fine.
Earlier during the day, CM Dhami reached the Silkyara Tunnel in Uttarkashi and prayed to the Baukh Nag Devta for the well-being of all the trapped workers.
Also Read |
Uttarkshi Tunnel Rescue: Rat hole mining to be employed to remove debris through manual drilling
On November 12 a portion of the under-construction tunnel from Silkyara to Barkot collapsed and debris falling in the 60-metre stretch on the Silkyara side of the tunnel trapped 41 labourers inside. (with ANI inputs)